M27 CLOSURE BETWEEN JUNCTION 9 AND JUNCTION 11
As Highways England continues to convert the M27 between junctions 4 and 11 to a Smart Motorway
it will be installing the new North Fareham Footbridge which will be situated between junctions 10 and 11 of the M27.
The bridge installation will require a full closure of the M27 between junctions 9 and 11 (including access off and onto the M27 at junction 10) from 9.00pm on Friday 4 September
2020 through until 6.00am of Monday 7 September 2020.
A diversion will be in place during the closure and Highways England say it will ensure that everyone living along the diversion route will be informed in advance.

Share this post